Click on photo to start slide show.
Trestle on previous club layout was inspiration for the new.
Another Trestle on the old club layout.
Staging yard in the back room leads to the new layout.
Full length of the new layout.
Framework for the new trestle.
Construction oof the cliff behind the trestle begins.
The rock face of the cliff is added.
Foundation work for the trestle.
Trestle is completed.
Leads from the staging tracks are on the lower level.
Ground level is completed, with structures and scenery added.